Assessments - Evaluations - Due Diligence
1500 Walnut Street - Air Study for Suite 2030
1900 Rittenhouse Square - Capital Reserve Study
201 King of Prussia Road - HVAC Study of AHU-3 and Induction Units
201 King of Prussia Road - Building Roof Pressurization Study
240 Radnor Chester Road - Atrium Cooling Study
3400 J Street - Metering and Billing Investigation
4700 Wissahickon Ave - Evaluation of Site Work & Prevention of Future Water Leaks
833 Chestnut - Standby Generator Study
AmeriHealth - Airport Business Center Facilities - Building Evaluation
AmeriHealth - Building Power Capacity Assessment - Charleston, SC
Archbishop Ryan High School - Peer Review of Keough Lighting Report
Archbishop Wood High School - Water Pressure Issues
Ascension Manor I - Boiler Study
Ascension Manor II - Feasibility Study to Provide Generator Power to Fire Pump
Beaumont at Bryn Mawr - Generator Study
Beaumont at Bryn Mawr - Short-Term Standby Power Reliability Improvement
Belmont Charter School - Due Diligence Study - Toilet Rooms and Kitchen
Bishop McHugh - Air Conditioning Study
Boeing Ridley Park - Buildings 3-12 and 3-25 Steam Condensate Study
Brandywine Realty Trust - Smoke Control Operations Review
Burlington County Bridge Commission - 2016 Facilities Inspections
Burlington County Institute of Technology - Selective Coordination Study
Cellular Tracking Technologies - Oven Exhaust Fan
Chewy.com - Humidity Issues
Chestnut Hill College and Mt. St. Joseph's Convent - Water Distribution Study
Cira Centre - After Hours Cooling Cost Analysis
Cochran Primary School - HVAC Systems Review
Cooper University Hospital - HVAC Study for Cooking Hood
Copley Place - NM MEP Due Diligence
Dallas Elementary School - Facilities Assessment
Doylestown Assisted Living Fan Study
Due Diligence Report for Doc Breslin's Cavity Busters
ETS - Wood Hall Parking Lot Ground Water Study
Fashion District Philadelphia - Drainage Collection Tank Study - 801 Market St.
Fox Chase Cancer Center - As-Built Drawings for Main Campus
Free Library of Philadelphia - Fishtown Branch - HVAC Analysis
Free Library of Philadelphia - Ventilation Study
Germantown Cab Company
Health Center #3 - Chiller Replacement/AHU Study
Hobis Office Building - Building Separation Study
Infrastructure Study - Port Royal/Pan American/Blue Palm/Starlux
Jennings Elementary School - Static Pressure Calculations
Komatsu Northeast - Rooftop Unit Assessment
Macon MSC - Rooftop Evaluation
Malvern School - Drawing Review
Merakey - HVAC/Electrical Assessment - 4700 Wissahickon Avenue
National Constitution Center - HVAC Study for Main Exhibition Artifact Cases
Oak Hill Condominiums - Terrace Building Sanitary Study
One Logan Square - Revised Cooling Tower Replacement Specification
One Oxford Valley Mall - Fire Protection Study - Langhorne, PA
One Washington Square Parking Structure - Stormwater Discharge Pipe Review
Our Lady of Grace - Mechanical Systems Due Diligence Study
Our Lady of Grace Parish - Building Systems Review
Parc Rittenhouse - Heat Pump Relocation Study Units 301 & 318
Parkway Central Library - Assessment of HVAC Systems Supporting Rare Book Room
Penn Mutual - Water Softener/Tower Pump Study
PPMC - Emergency Power Study
QVC - MEP Systems Evaluation for Call Center Renovations
Rittenhouse Condominium - Domestic Water Heater Replacement - Feasibility Study
Rosoff Residence - HVAC System Evaluation
Showboat Atlantic City - 2nd Floor Due Diligence Study
Shriners Children's Philadelphia - Cooling Tower Replacement Due Diligence Study
Surgery Center of Chester County - OR Reconfiguration - MEP Systems Analysis
The Dorchester - Boiler Replacement Study
The Dorchester - Lobby HVAC Study
The Grand at Diamond Beach - Review of a Residence Heat Pump
The Lighting Practice - HVAC Remediation/Air Purification
The Sporting Club at the Bellevue - Domestic Water Heater Study
Three Logan Square - Harmonics Study
Valley Manor - Fire Alarm Audible Notification Study
Vanguard - Victory Building - Atrium Smoke Exhaust Investigation
Verizon Allentown C.O. - Second Floor HVAC Study
Verizon Ashland C.O. - Switchgear, Generator, and HVAC Study
Verizon Camden C.O. - HVAC Capacity and Redundancy Study First Floor
Verizon Davenport C.O. - HVAC and Generator Study
Verizon East Petersburg C.O. - HVAC and Electrical Study for Inside Hut
Verizon Fleetwood C.O. - Generator Capacity Study
Verizon Green Lane C.O. - HVAC Study
Verizon Hatboro C.O. - Second Floor HVAC Study
Verizon Jim Thorpe C.O. - Switchgear, Generator, and HVAC Study
Verizon Lewistown C.O. - Switchgear, Generator, and HVAC Study
Verizon Macon MSC - Feasibility Study
Verizon Nesquehoning C.O. - Engineering Building Study
Verizon Oregon Avenue - Building Study
Verizon Palmyra C.O. - HVAC Study
Verizon Springfield C.O. - HVAC Study
Widener Building - Northwest Lobby Pressurization Study
Women's Animal Center - HVAC Study - Bensalem, PA